In this post I will describe the common fundamental demands of an audio, modern-day high stress, straight installment. The complying with summary associates to a contemporary high pressure (400/600Kpa) system usually made by Kwikot South Africa.

geyser installationgeyser installation


Less typical are old low pressure systems (100kpa) open pipe or "Latco" kind systems. Know that the parts are NOT interchangeable in between both distinctive systems - High pressure and Low pressure! It is possible to remove an old low pressure system as well as change it with a modern high pressure system however - you get a new high stress hot spring and also mount it according to the present specification.



The very same guidelines use but there are some special considerations described at the end - with a representation. picture kwikot - The most obvious point that you ought to see immediately. The hot spring sits in a tray constructed from plastic (frequently red) or tin plate. I prefer the plastic ones.

Given that June 2001, the drip tray is not optional - its obtained to be there as well as there needs to be a drainpipe pipeline for it! The drain is a 50mm PVC waste pipeline that drains the tray by piping the water out the house. I have actually seen lots of drip trays set up without drains pipes! If your installment pre-dates June 2001 you may intend to get a plumber to look at it.

6 Simple Techniques For Geyser Installation

The following most noticeable function would be the. These are small brass parts mounted at the end of a 30cm length of pipeline. The two vacuum breakers stand vertically about 30cm over the hot spring. These are necessary, as they stop water siphoning out the geyser when the chilly supply is quit.

Remember that vacuum breakers are a sensibly brand-new requirement - there are still thousands of old HP systems out there without vacuum cleaner breakers and I am yet to see one collapse. Just due to the fact that I haven't seen it does not indicate it's not happening!

The chilly water side is the side that straight attaches to the drainpipe dick and gets in the geyser at the bottom. After the turned off shutoff you would usually find a Pressure Control Shutoff (PCV). There are a number of different types, mostly made of brass yet some are made of plastic.

This is where the PCV see this site launches pressure and also this is the pipeline that frequently leaks. Don't panic if you can not discover the PCV beside the hot spring - it may be placed up to 10 metres away, typically in a much more accessible put on a wall exterior. In some cases it remains in a little plastic box exterior.

What Does Geyser Installation Mean?

This shutoff needs to have a metal (copper or steel) pipeline linked to it as well as the pipeline have to lead directly out the structure. This vent pipe is an essential safety function of the entire system.

The T&P shutoff is the least optional element - it has to exist! - The weight of the hot spring need to be appropriately sustained on the roof covering trusses - a minimum of two supports under the 'feet' of the hot spring. If it looks unstable obtain a plumber to check it out.

This was not a need on old geysers, however it is now as well as it's worth fitting one. The geyser has to be earthed! I have seen lots of geysers with the earth cord inapplicable. All the copper pipes should likewise be earthed as well as adhered to the geyser planet. This is not an unimportant preventative measure! Get a certified electrical expert to inspect your installation if the bonding is missing out on or looks dodgy.


Once more, these are often just left lying following to the geyser. There are basically just two primary thermostat types - the modern-day round "Kwiktherm" in more recent Kwikot geysers and also the VK (rectangular block) enter older geysers and also in some newer non-Kwikot systems. The hot spring may be fed (cold water) with polcop (plastic) pipe - as much as the shut down valve, yet the pipeline right into and out of the hot spring have to be copper or galvanized steel.

The Best Strategy To Use For Geyser Installation

geyser installationgeyser installation


The warm water side ought to be copper, steel or suitably ranked (70) plastic or composite pipeline. Keep in mind that you need to have at the very least 1m of copper/steel pipeline out the geyser - you may not attach plastic (compound) pipeline directly to the geyser. As above, the PCV as well as T&P should be made from check my site copper or steel - especially the air vent out of the T&P valve.

geyser installationgeyser installation


I have seen a number of Check This Out setups where the installer has merely run a brief size of 22mm copper right into the drip tray with the idea being that the T&P can air vent straight right into the drip tray. A concept since the hot (100 +) water/steam thaws the drip tray and the PVC drain pipeline.

The PCV is generally over the hot spring and also the cold water flows down into the geyser. This is fairly crucial since it creates an anti-syphon loop that stops the geyser from draining back via the inlet in the occasion of a water system failure. If you get warm water coming out your cool taps when the supply of water falls short after that this is not functioning correctly.